Central de cogeneración 6R22/26

Central de cogeneración 6R22/26
Denominación
Central de cogeneración 6R22/26
Número de artículo
855977
Fabricante
desconocido
Modelo/Tipo
6R22/26
Documentos
CERTIFICATO_CONFORMITA_A_MARCATURA_CE.pdf SCHEMA_IMPIANTO.pdf SCHEMA_MECCANICO_CIRCUITI_ACQUA_IMPIANTO_COGENERAZIONE.pdf SCHEMA_MECCANICO_CIRCUITO_OLIO_VEGETALE_IMPIANTO_COGENERAZIONE.pdf TEST_PROTOCOL.pdf VTR184-11_21_ZTL2106.pdf MANUALE_WARTSILA_compressed.pdf LEROY_SOMER.pdf
Videos
vídeo 1
Año de fabricación
2012
Disponibilidad
immediately
Estado
Lugar
Italia, 65012 Vallemare (PE)
Gastos de desmontaje y carga (opcional)
30.000,00 €
Gastos de transporte
no incluidos
Condiciones de entrega
EXW Vallemare (PE), desde el basamento, sin embalar
Condiciones de pago
100% previo cobro
Dimensiones en planta aprox. (l x w x h)
desconocido
Peso aprox.
1 kg
Cogeneration plant for the electricity production from renewable sources

The machine was created to be fueled with vegetable oils of rapeseed, sunflower and soybean oil, but thanks to the complex heated introduction system, it can burn animal fats and palm oil.
The hourly production of electricity is equal to 940 kw/h

The machinery is composed of:
  • power source with fuel heating before combustion (underground tanks excluded)
  • WÄRTSILÄ NSD 6R22/26 engine, produced in 1999 with a power of 1,065 kw at 1,000 rpm (power reduced to 940 kw/h to comply with authorisations)
  • alternator
  • DENOX system control panel
  • catalytic silencer with cover and chimney
  • chiller for cooling and heating systems
  • hot water generation system with heat exchanger for powering warehouse heating systems
  • transformer room with control panels, Landis+Gyr E650 meter, MESSINA SVT/R+AC/R medium voltage disconnect switches, transformer (masonry box excluded)
  • spare parts for most wear components in order to never have long repair times (set of valves and injection pumps, 4 overhauled heads, everything needed to dismantle valves and heads for maintenance, special wrenches, specific jacks, compression tests, etc.)
The plant is equipped with a practically new smoke reduction system (SCR) as there are all the components on the ground to replace the DeNox bricks. The urea dosing system is completely automatic with daily online control.
Furthermore, the entire vegetable oil treatment plant has a redundant system as the entire transfer line has a double pump system.
The air and oil cooling system is oversized precisely in anticipation of it being used in warmer areas compared to the previous allocation (Finland).
The VTR184 turbine is new, mounted 2 months before the shutdown. 

The plant is currently stopped due to the need to replace a damaged piston rod. The repair was estimated at €60,000-70,000 (changing piston rod, piston and cylinder grinding) Mostrar traducción
Traducción automática
Venta directa
9 seguidores
Central de cogeneración 6R22/26
9
Seguidor
a petición
Precio
Nuestros servicios
  • Servicio de desmontaje y montaje
  • Red logística mundial
  • Asesoramiento individualizado
  • Ayuda con la documentación y los trámites aduaneros