Formwork and scaffolding - Dismantled components

Formwork and scaffolding - Dismantled components
lote núm. 20
Cierre: 16/01/2025 9:01
12.000 € Precio de salida
2 seguidores
Iniciar sesión para pujar Para poder pujar se requiere un depósito
Establecer el agente de pujas
+ comisión al comprador e IVA
Formwork and scaffolding - Dismantled components
16/01/2025 9:01
Cierre
12.000 €
Precio de salida
Denominación
Formwork and scaffolding - Dismantled components
Número de artículo
980397
Fabricante
desconocido
Modelo/Tipo
desconocido
Documentos
Lista_lotto_20.pdf Lot_20_list.pdf
Año de fabricación
desconocido
Disponibilidad
By appointment
Estado
Lugar
Italia, 10072 Caselle Torinese
Restricción por país
comisión al comprador
19 %
Precio total
IVA no incluido
Gastos de transporte
no incluidos
Condiciones de entrega
EXW Caselle Torinese, desde el basamento, sin embalar
Condiciones de pago
100% previo cobro
Depósito de garantía
Se requiere el pago de un depósito
Dimensiones en planta aprox. (l x w x h)
desconocido
Peso aprox.
1 kg
Lot consisting of components for mezzanine scaffolding.
The list drawn up by the expert is attached to this announcement.

ATTENTION!
In order to participate in this auction, a deposit of Euro 1200.00 is required, which will be withheld until the outcome of the adversarial verification of the state of the sites and the prior deposition of safety documentation that can be consulted after the signing of an NDA.
The deposit shall be paid by bank transfer to the current account in the name of Surplex Srl. For further information: matteo.tosin@surplex.com

The lot includes the following works that must be carried out in the above-mentioned time order within and no later than 30 days from the awarding of the contract.

The complete removal of the goods and proper disposal of the NON-FERROUS materials remaining after removal.
The complete floor cleaning of the respective area.
Access to the site will be allowed only after delivery of all necessary documentation for site safety, in accordance with the regulations in force and the
specific provisions of the vendor.
Liability insurance is required for possible damages.

Surplex will monitor the progress of the work to ensure that deadlines are met.

ATTENTION : The list was drawn up by the delegated expert for the bankruptcy proceedings and has not benefited from further verification. Please note that any omissions are not attributable to Surplex. A thorough inspection is therefore recommended.

An advance payment of €300 per day will be required for the costs of monitoring the collection operations.
Every 30 days after the due date, the surveillance fee will vary by double the previous amount. Mostrar traducción
Traducción automática
Subasta
Liquidación judicial N°195/2024 Tribunal de Turín: Andamios para obras y equipos de construcción
lote núm.
20
Documentos
Términos especiales de la subasta
Inspección
Sábado, 11/01/2025, de 9:00 horas a 13:00 horas

Sábado, 11/01/2025, de 14:00 horas a 16:30 horas
Italia
- dirección a petición -

Visita sólo con cita previa!
Reserve una cita para la visita de inspección
  • Citas
    Sábado, 11/01/2025, de 9:00 horas a 13:00 horas

    Sábado, 11/01/2025, de 14:00 horas a 16:30 horas
  • Italia
    - dirección a petición -

    Visita sólo con cita previa!


Nuestros servicios
  • Servicio personalizado en 16 idiomas
  • Asesoramiento presencial y por expertos
  • Organización del transporte bajo petición
  • Ayuda con la documentación y los trámites aduaneros